Page 64 - TANGKIRAN
P. 64

PROJECT COMPONENTS




                                                                            A.  Establishment of Nursery

                                                                                A four-unit gutter-connected sawtooth greenhouse with fully automatic
                                                                                irrigation system (mist and drip irrigation) was constructed for the
                                                                                propagation and acclimatization of nipa seedlings before the actual planting
                                                                                in the plantation area. This 6 meters x 24 meters nursery was designed to
                                                                                withstand the extreme weather of Gonzaga.




                                                                           B. Identification of Recipients

                                                                                Identified recipients of the program are fisherfolks from Aparri and Sta.
                                                                                Ana with existing group or association.



                                                                           C.  Capability building

                                                                                To prepare the fisherfolk for the actual implementation of the program, the
                                                                                CSU-Gonzaga conducted trainings on propagation of bamboo seedlings,
                                                                                plantation maintenance and protection.


                                                                            D.  Establishment of nipa plantation


                                                                                CSU Gonzaga established nipa plantations in Sta. Ana and Aparri.
                                                                                In Sta. Ana, Cagayan, a 50-hectare new nipa plantation was planted with
                                                                                120,000 seedlings. In Aparri, a total of 75,000 nipa seedlings were planted
                                                                                in a 60-hectare nipa restoration area.


                                                                            E.  Maintenance and protection


                                                                                To ensure proper maintenance and protection of the established nipa
                                                                                plantations, the Department of Environment and Natural Resources (DENR)
                                                                                alotted 250,000 pesos annually for 3 years as incentive for the beneficiaries.



    64 64
   59   60   61   62   63   64   65   66   67   68   69